香埠全能地坪
XIANGBU ALL TERRAIN上海香埠建材科技有限公司
值班手机:18858182178周先生
固定电话:18858182178
香埠邮箱:1017326576@qq.com
公司地址:上海市宝山区高逸路112-118号3幢2313室
XB-12环氧磨石地坪系统 Epoxy terrazzo floor system
★适用范围 Scope of application
机场、宾馆、星级酒店、会议中心、展览馆等大型公共建筑以及高级私人住宅地面的装饰。
The airport, hotel, star hotel, conference center, exhibition center and other large public buildings and advanced private residential decoration on the ground.
★性能特点 The performance characteristics of
1、拥有环氧树脂地板的所有优异性能;
2、设计成各种图案、体现设计上的灵活性。
1, with all the excellent performance of epoxy resin floor;
2, design into all sorts of design, design flexibility.
★施工工序 Construction process
1、地面经过打磨、除尘、整固等预处理后;
2、采用无溶剂环氧清漆或水性环氧清漆刮涂打底;
3、底漆实干后用无溶剂低黏度环氧树脂掺石英砂和(或)石英粉制成砂浆漆刮涂;
4、制作图案层:按预先设计好的图案式样将模具用环氧胶或其他高强度粘接剂粘接在砂浆层上,然后往模具中浇筑摊铺无溶剂环氧磨石地坪浆料而后震动抹平,边角处采用手工操作,摊铺厚度高出图案层设计厚度0.2~0.3mm;
5、在图案层外侧整体浇筑摊铺浆料颜色和磨石集料明显不同于图案层的无溶剂环氧磨石地坪浆料,直至高出图案层的高度0.2~0.3mm,震动抹平,边角机械不到之处采用手工操作。图案层与图案外侧浇筑浆料共同构成磨石层;
6、固化24h后,用打磨机全盘打磨至少2遍后,再用细砂纸打磨至少1遍,使表面平整,无突起;
7、吸尘后镘刮无溶剂环氧树脂透明涂料至少2道,以填补磨石层中留下的孔隙,增加涂层的致密性。每遍施工间隔为6~10h;
8、待最后1遍透明漆料至少固化3天以后,至少镘打1遍水性液体地板蜡进行保养。
1, the ground after polishing, dust removal and consolidation pretreatment;
2, using solventless epoxy varnish or water-based epoxy varnish coating base;
3, primer work after using solventless epoxy resin with low viscosity of quartz sand and (or) quartz powder mortar paint coating;
4, production pattern layer: according to the preliminary design good design style will die with epoxy resin or other high strength adhesive glue on the mortar layer, and then into a mould casting paving solventless epoxy terrazzo floor size and vibration, edge part USES the manual operation, paving pattern design thickness is higher than that of the thickness of 0.2 ~ 0.3 mm;
5, in the design of the lateral integral casting paving slurry design of color and stone aggregate is very different from solventless epoxy terrazzo floor material layer and until the pattern layer above the height of 0.2 ~ 0.3 mm, vibration, edge horn machinery is less than the place of use manual operation. Pattern layer and the outer casting slurry constitute millstone layer;
6, 24 h after curing, with at least 2 times of grinding machine completely burnish, with a fine sandpaper, at least 1 time, make the surface level off, without ridges;
7, vacuuming trowel scratch solventless epoxy resin transparent paint at least 2, to fill the stone layer in the pore, increase the density of the coating. Each time interval of construction for 6 ~ 10 h;
8, when the last 1 time transparent paint curing at least three days later, at least trowel play 1 times water-based wax of a liquid for maintenance.